The final preparations are underway at a public realm lighting...
26 Aug 2013
![tumblr_ms57kyBdjS1rnb3cfo2_500.jpg](https://78.media.tumblr.com/301293df050765613830d69abffb341b/tumblr_ms57kyBdjS1rnb3cfo2_500.jpg)
![tumblr_ms57kyBdjS1rnb3cfo1_500.jpg](https://78.media.tumblr.com/4d05b20bc0c0aa863a18556c59b08273/tumblr_ms57kyBdjS1rnb3cfo1_500.jpg)
The final preparations are underway at a public realm lighting project in Glasgow’s south side. The specially commissioned columns have arrived from Germany and are now installed with the switch-on due take place within the next few weeks. Collective Architecture developed the patterns through a community workshop exploring the layering of colour and shadow with the natural silhouettes visible in trees and leaf patterns. This is the final phase of a public realm project including work by Pidgin Perfect, Wave and several other designers and artists.